Pressurized solar panels can be dismantled by following these essential steps: 1. Identify the panel's mounting method and carefully remove it, 3. Transport. . First to test if it would work, by running a garden hosepipe into the upper/fill port on the side of the pump station, turning the isolation valve (between ports) horizontal, then connecting a drain pipe to the lower/drain port. Result was that mains pressure was fine to inject a decent flow rate. . US hoses do connect but require 3 or more fl at gaskets to make a water tight fi t. Hoses must be glycol, pressure (100 psi) and temperature (200°F / 95°C) proof. The Bosch and Buderus solar fi lling station (part number 8718530474) comes with both NPT and BSP hoses. A small tank (the drain-back vessel). .
[PDF Version]