How to Measure Ground Resistance and Optimize
The purpose of this inspection is to determine if the equipment, frame, structures, or enclosure grounds are connected to the grounding electrode or ground grid with low resistance.
View DetailsOur cell site grounding,telecommunications grounding and communication tower grounding methods closely follow the Motorola R56 standards and IEEE Std 142-1991 and IEEE Std 142-2007 recommended Practice for Grounding of Industrial and Commercial Power Systems guidelines for cell site and telecommunications sites.
According to the IEEE Std 142-1991 and IEEE Std 142-2007 (The Green Book), the communication tower grounding electrode resistance of large electrical substations should be 1 Ohm resistance or less. For commercial and industrial substations including cell site and telecommunications sites the recommended resistance to ground is 5 Ohms or less.
Surface material becomes very important when designing a substation ground grid in high resistive soil. A layer of crushed rock or other material has become the design standard to provide a high resistance between the ground grid and personnel.
The knowledge of the grounding system resistance is essential for the calculation of these voltages in cases of faults. The grounding systems commonly used, consist of single rods, rodbeds or arrays of rods, grounding grids and combinations of the previous types. The grounding resistance of a system can be calculated by various methods.
The purpose of this inspection is to determine if the equipment, frame, structures, or enclosure grounds are connected to the grounding electrode or ground grid with low resistance.
View Details
Summary Recommendation ITU-T K.112 provides a set of practical procedures related to the lightning protection, earthing and bonding of radio base stations (RBSs). It considers two types of RBS: those
View Details
COMMUNICATIONS INSTALLATIONS. Provide plan indicating location of system grounding electrode connections and routing of aboveground and underground grounding electrode
View Details
The results obtained by the FEM calculations are compared to those obtained by analytical methods, providing useful information about the most suitable methodology for the
View Details
1. OBJECTIVE The fundamental objective of this document is to provide guidelines and practices for Ericsson site equipment grounding, with recommended methods that are essential to
View Details
Summary Recommendation ITU-T K.112 provides a set of practical procedures related to the lightning protection, earthing and bonding of radio base stations (RBSs). It considers two types
View Details
Cell site grounding and telecommunications grounding solutions best practices Proper electrical grounding is essential for Cell Sites, BTS Cellular Base Stations,
View Details
Step 1 Good earthing (grounding) system according to IEC/BS EN 62305-3:2011 standard E.5.4 Earth-termination system E.5.4.1 General () The LPS designer and the LPS installer should
View Details
Cell site grounding and telecommunications grounding solutions best practices Proper electrical grounding is essential for Cell Sites, BTS Cellular Base Stations, telecommunications or
View Details
Step 1 Good earthing (grounding) system according to IEC/BS EN 62305-3:2011 standard E.5.4 Earth-termination system E.5.4.1 General () The LPS designer and the LPS installer should select
View Details
The increase in “shared” teleco/utility locations has greatly increased the need for these critical issues to be remedied. Close coordination and cooperation are needed from all
View Details
Step 1 Good earthing (grounding) system according to IEC/BS EN 62305-3:2011 standard E.5.4 Earth-termination system E.5.4.1 General () The LPS designer and the LPS installer should select
View Details
COMMUNICATIONS INSTALLATIONS. Provide plan indicating location of system grounding electrode connections and routing of aboveground and underground grounding
View Details
Cell site grounding and telecommunications grounding solutions best practices Proper electrical grounding is essential for Cell Sites, BTS Cellular
View Details
The generally accepted practices to reduce the ground grid resistance include adding soil enhancing materials, using close grid spacing, and installing deep ground wells in
View Details
1. OBJECTIVE The fundamental objective of this document is to provide guidelines and practices for Ericsson site equipment grounding, with recommended methods that are
View Details
The building of high-powered electrical systems has resulted in a continuous increase in the power capability of the national electric grid and the need for higher-rated grounding components
View Details
The building of high-powered electrical systems has resulted in a continuous increase in the power capability of the national electric grid and the need for higher-rated
View Details
The generally accepted practices to reduce the ground grid resistance include adding soil enhancing materials, using close grid spacing, and installing deep ground wells in an attempt to
View Details
The increase in “shared” teleco/utility locations has greatly increased the need for these critical issues to be remedied. Close coordination and cooperation are needed from all parties
View Details
The results obtained by the FEM calculations are compared to those obtained by analytical methods, providing useful information about the most suitable methodology for the
View DetailsPDF version includes complete article with source references. Suitable for printing and offline reading.